To the central content area

Nantuo County - 112 Nantuo County Water Pollution Source Inspection, Control and Animal Husbandry Recycling Guidance Project

Absrtact
1. In-depth inspection of water pollution sources: (1) Classified control and in-depth inspection of listed water pollution enterprises: The number of contracts is 100. During the implementation period of the plan, 108 effective inspections have been completed, with a completion rate of 100.0%. For repeated failure to improve in the hierarchical control guidance, the Environmental Protection Bureau has been reported to undertake the strengthening of audit control work. Please refer to Section 4-1 of this report for details. (2) Water sample inspection work: This plan conducted a total of 87 sampling and analysis operations. The sampled households included 25 households in the catering industry, tourist hotels (restaurants), 20 households in the animal husbandry industry, and 32 households in other businesses. The achievement rate is 100.0%. 2. Water pollution prevention and control license review and filing work: There are 284 cases of license applications for water pollution sources as of November, of which 227 have been approved, and 57 are in the process of making corrections, or have agreed to trial operation or project construction. . Please refer to Section 4-2 of this report for details. 3. Execution of functional evaluation and abnormal diagnosis operations of waste (sewage) water treatment facilities in public institutions or sewage and sewer systems: a total of 7 abnormal risk object inspection operations and 4 functions evaluation operations of waste (sewage) water treatment facilities in public institutions. Currently, 7 abnormal risk object inspections and 4 functional evaluations have been completed. The relevant handling methods are detailed in Section 4-3. 4. Ensure the stable operation of the automatic water quality and quantity monitoring and video surveillance facility system: This plan will be monitored at 8:30 every day. During the implementation of the plan, abnormal website display and website data will not be updated immediately. After discovery, Immediately call the person in charge of the Environmental Protection Bureau and the person in charge of each factory. After confirmation, all have been repaired or improved. In addition, 14 units in the county have set up automatic monitoring (visual) equipment. According to the regulations of the Ministry of Environment, the forms (documents) are all The verification has been completed. Please refer to Section 4-4 of this report for details. 5. Assistance in the collection of water pollution prevention and control fees: This plan is implemented to assist in confirming the list of enterprises that collect water and sewage fees. After confirming the number of companies that need to pay water and sewage fees, as of the end of July 2012, there are still 42 companies that have not declared or paid. All of them have issued letters and made phone calls to urge payment. In addition, 15 companies on the list of doubtful water and sewage fee declarations delivered by the Environmental Protection Agency have conducted water and sewage fee inspections. The inspections have been completed before the end of August and a letter has been provided to the Environmental Protection Agency for recovery or refund. For reference materials, please refer to Section 4-5 of this report for details. 6. Promote the policy of using livestock manure, slurry and digestate as agricultural land fertilizer and strengthen the inspection and control of livestock farms: This plan has selected 5 companies to apply for guidance. During the project period, 5 livestock slurry, digestate, and groundwater will be targeted. Irrigated farmland soil for sampling, and assisted in writing a plan for the use of biogas residue and biogas slurry as fertilizer for farmland at the end of October and submitted it to the Agriculture Department for review. In addition, 23 businesses that have obtained biogas slurry and biogas residue approval have been Eight operators that are eligible for water release for irrigation will conduct regular soil and groundwater tracking sampling operations. At the same time, strengthened inspection sampling will be carried out for operators that have not yet obtained animal husbandry resource utilization, and the operators will be coached to obtain approval for animal husbandry resource utilization measures as soon as possible in accordance with the resource utilization process. , as shown in Section 4-6. 7. 2 publicity and briefing sessions on handling water pollution sources and 1 observation activity on high-quality biogas slurry and biogas residue irrigation sites: 2 publicity and briefing sessions on handling water pollution sources were completed on September 15, 2012 and October 12, 2012. If there are business operators who did not participate in the briefing session, the written materials of the promotional briefing session will be sent to the operators in the form of a certificate of delivery, so that the publicity rate of the promotional briefing session reaches 100%; in addition, the process was completed on August 3, 2012 Observation activities at excellent biogas slurry and biogas residue irrigation sites are held one after another. For details, please refer to Section 4-7 of this report. 8. Conduct a tracking evaluation of the functional effectiveness of the inter-gravel contact purification water quality improvement facilities in Puli Town: During the implementation period of this plan, a total of 12 operations and maintenance were performed at the Yuying Bridge Demonstration Site, including the floating debris accumulation at the water diversion channel inlet and the inter-gravel purification area. The silt inside was removed 10 times, and the surrounding environment was tidied and weeded twice. 9. Conduct inspections in accordance with the 2012 Industrial Zone Water Pollution Prevention and Management Plan: Enterprises that have violated regulations, enterprises that have not reported regular inspections or have incomplete declaration information, and enterprises whose emissions exceed the approved amount in the first half of this plan All are reviewed and confirmed, and relevant improvement measures are provided. Please refer to Sections 4-9 of this report for details. 10. Handle the audit work of the "112-Year Domestic Sewage Pollution Reduction Project Plan" of the Environmental Protection Agency of the Executive Yuan: During the project period, 7 public sewage sewer systems in the county have been inspected on a quarterly basis, and 10 community sewage sewer systems have been inspected in September. The publicity and review of the standardized contract for the entrusted operation of sewage treatment facilities were completed months ago. For details, please refer to Chapter 4-10 of this report. 11. Assist and cooperate with agencies in handling emergency response to water pollution incidents: During the implementation period of this plan, Nantou County emergency response will be carried out in the storage room of Nantou County Stadium on March 24, 2020 and May 16, 2020 respectively. Material classification, sorting and management work. On June 29, 2012, he participated in the Miaoli Environmental Protection Bureau's handling of the water pollution incident in the central district and marine pollution response education and training, and on August 15, 2012, he participated in the water bodies (rivers and oceans) in the central district of Miaoli County. Emergency response drills for pollution incidents. 12. Handle business related to water pollution management of other enterprises: During the implementation of this plan, assist in submitting the vision for river pollution control (including watershed management), the list of key measurement stations and assessment allocations, and assist in writing revisions and submissions in March 2020. Submit the pollution reduction plan for key measuring stations in the annual "River Pollution Remediation (Including Watershed Management) Plan" and assist in submitting the annual assessment results report on November 5, 2020.
Keyword
Water Pollution Source Inspection, Control, Animal Husbandry Recycling Guidance
Open
top